• BTCBitcoin hashprice $27.98/PH/day▼ 1.07%
  • BCHBitcoin Cash hashprice $24.88/PH/day▼ 0.00%
  • LTCLitecoin hashprice $0.0564/GH/day▲ 0.23%
  • DOGEDogecoin hashprice $0.377/GH/day▲ 30.10%
  • KASKaspa hashprice $0.135/TH/day▼ 3.73%
  • ALPHAlephium hashprice $0.142/TH/day▲ 6.68%
  • ETCEthereum Classic hashprice $0.348/GH/day▲ 5.73%
  • ZECZcash hashprice $0.0300/kSol/day▲ 0.53%
  • DASHDash hashprice $3.58/TH/day▲ 14.91%
  • KDAKadena hashprice $13.72/PH/day▲ 4.59%
  • HNSHandshake hashprice $0.222/TH/day▼ 28.68%
  • CKBNervos hashprice $0.0823/TH/day▲ 22.67%
  • XMRMonero hashprice $0.0329/kH/day▲ 3.25%
  • ALEOAleo hashprice $2.44/GH/day▼ 8.31%
  • Install Solar, Wind or Hydro Energy For Long Term Gains. Consult with us!!!
Skip to content

New: live mining profitability calculator with real-time network data Try it free

Bitcoin price: $59,087 -2.81%

Farm design & consulting

Mining farm consulting for a site that earns from day one

Our mining farm consulting covers power capacity, electrical layout, airflow or liquid cooling, noise, networking, monitoring and the financial model, planned before money is spent.

Scope

What we plan with you

Power and electrical

Available capacity, transformer and distribution sizing, PDUs, circuit plans and protection, coordinated with your electrical engineer.

Power planner

Cooling and airflow

Heat load, intake and exhaust, hot and cold aisles, evaporative cooling, hydro loops or immersion tanks.

Buildings and containers

Container versus building, layout, racking, access and maintenance space.

Noise

Expected noise at the boundary and how to reduce it for neighbours and permits.

Network and monitoring

Connectivity, redundancy, miner management software and alerting.

Financial model

Capex, opex, difficulty growth, the halving and sensitivity to BTC price and power cost.

ROI planner
Engagement

How a project runs

  1. Discovery call

    Site, power, budget, goals and constraints.

  2. Assessment

    Feasibility, options and a first financial model.

  3. Design

    Layout, equipment list, cooling and electrical plan with your engineers.

  4. Deployment support

    Miner supply, commissioning and tuning.

Licensed professionals

Electrical and structural work must be designed, approved and installed by licensed professionals to local codes. We work alongside your engineers and contractors.

What mining farm consulting should deliver

Good mining farm consulting ends with documents you can act on: a power and electrical plan sized for continuous load, a cooling design (air, hydro or immersion), a layout with service access, a network and monitoring plan, and a financial model with the assumptions written down.

The financial model matters most. It should show revenue under several Bitcoin price and difficulty scenarios, the effect of the next halving, power and staffing costs, and how much curtailment the site can accept. Our farm planning guide explains each part.

Mining farm consulting is most useful early, before equipment is ordered or a power contract is signed. A few days of planning can prevent a transformer that is too small or a building that cannot shed its heat.

We can work from a rough idea, such as a power source and a budget, or review a plan your team has already drawn up. Either way, you get clear recommendations and the reasoning behind them.

The result is yours to keep and use with any contractor or supplier you choose.

Have a site or a power source?

Tell us the capacity, location and timeline.