• BTCBitcoin hashprice $27.98/PH/day▼ 1.07%
  • BCHBitcoin Cash hashprice $24.88/PH/day▼ 0.00%
  • LTCLitecoin hashprice $0.0564/GH/day▲ 0.23%
  • DOGEDogecoin hashprice $0.377/GH/day▲ 30.10%
  • KASKaspa hashprice $0.135/TH/day▼ 3.73%
  • ALPHAlephium hashprice $0.142/TH/day▲ 6.68%
  • ETCEthereum Classic hashprice $0.348/GH/day▲ 5.73%
  • ZECZcash hashprice $0.0300/kSol/day▲ 0.53%
  • DASHDash hashprice $3.58/TH/day▲ 14.91%
  • KDAKadena hashprice $13.72/PH/day▲ 4.59%
  • HNSHandshake hashprice $0.222/TH/day▼ 28.68%
  • CKBNervos hashprice $0.0823/TH/day▲ 22.67%
  • XMRMonero hashprice $0.0329/kH/day▲ 3.25%
  • ALEOAleo hashprice $2.44/GH/day▼ 8.31%
  • Install Solar, Wind or Hydro Energy For Long Term Gains. Consult with us!!!
Skip to content

New: live mining profitability calculator with real-time network data Try it free

Bitcoin price: $59,043 -2.62%

Hydro-cooled miners

Hydro miners: quieter, denser, more efficient

Hydro miners replace fans with a liquid cold plate. They run near-silent, pack more hashrate into less space and deliver warm water you can reuse.

Live from our stock

Hydro miners

What you need

A hydro miner is part of a system

Each unit connects to a coolant loop with supply and return lines. A pump circulates treated coolant through the miners and a dry cooler, cooling tower or heat exchanger removes the heat.

Follow the manufacturer’s specifications for flow rate, inlet temperature, pressure and water quality for your exact model.

  • Coolant loop with pump, filter and manifolds
  • Dry cooler or tower sized for the total heat load
  • Treated coolant to prevent corrosion and scaling
  • Usually 3-phase or high-voltage power

Before you buy hydro miners

Water-cooled units need a cooling loop: pumps, a heat exchanger or dry cooler, the right coolant and flow rate, and filtration. Check the manufacturer’s specification for inlet temperature, flow and water quality before you order.

The payoff is density and silence: a rack of liquid-cooled ASICs fits far more hashrate into the same space than air-cooled ones, and the warm water can heat a building or a greenhouse. Our hydro setup guide walks through the whole system.

Many sites run a mix: air-cooled units where airflow is easy, and liquid-cooled racks where space, noise or climate make air cooling hard. Ask us which models fit your loop.

FAQ

Questions, answered

Are hydro miners worth it?

For dense sites, noise-sensitive locations or heat reuse, yes. For a single unit at home, the loop is usually more trouble than it’s worth.

Can I put a hydro miner in my garage?

Only with a complete loop and a heat rejection path outdoors. Most single-unit buyers host hydro miners instead.

Can you host hydro miners?

Where a partner facility has liquid cooling capacity, yes. Check the cooling type on each hosting plan.

Planning a hydro deployment?

We can help size the miners and the cooling.